...when it’s ballast!
We tackled the job of pulling out the old flotation from our DS1 today.
We pulled 130 pounds of the stuff from under the benches! And we haven’t even opened up the bow chamber yet.
We cut holes for 6” ports in the front of the benches, the surface facing the bow. Then started pulling out lengths of soggy 40-year-old styrofoam. I duck-taped the threaded end of a 3” hook to the end of a telescoping boat hook/pole, and used it to spear the blocks of foam that were all the way in and unreachable by hand.
I thought I’d post the pictures here, since it took me a long time to figure out what this job entailed. Maybe these pics will help some future new DS owner:
http://www.flickr.com/photos/davidcurle ... 661610522/
We’re letting the chamber dry up and then we’ll re-pack it with swim noodles as others have done.